water pump monitoring

KAUTHAR · Manage progress

Open view-only summaryAll projects

planningmediumFinal year project

Client share link

Create an unlisted URL your client can open without logging in. With a share parent domain configured, links use that client's branded host (name-based slug ending in -api, or a custom value from the database). They only see this project summary, the activity checklist, and files they can preview or download — not the rest of Honic.

Recent links

  • https://kauthar-api.honiccompany.com/share/d92a360a5350d135452e90d10e6e29aa16bc8d85c044e6bc

    5/3/2026, 12:25:33 PM

Pipeline & activity

Update each step from schematic through handoff (saved immediately). Use Outside our scope when your team does not deliver that step (another party provides it)—those steps are skipped for completion, not treated as pending work. A progress bar below shows live counts; View summary page → opens the read-only overview.

6/8 steps we deliver · 2 outside our scope · 8/10 addressed

Progress bar: 80% weighted — outside our scope counts like done; in progress counts half.

Schematic circuitCircuit simulationPCB layoutPCB fabricationProgrammingAssembling circuit & testPrototypeFull project testClient checkGive to client

Upload files to this project

Upload a new file, or switch to “Use file already in project folder” to open the client project folder, pick an existing file, and move it into the pipeline activity subfolder (same steps as above).

Files go under your project Drive folder in a subfolder named for this pipeline step (same steps as the checklist above).

Images, videos, PDFs, CAD, archives — any type the browser can pick. Same max size as global Drive upload (DRIVE_UPLOAD_MAX_MB).

Timeline

Milestones set at project creation. Dates and completion can be adjusted later via the database or a future editor.

No milestones yet. Add them when you create a project.

Tasks

Add tasks and set status; updates save to the project.

  • No tasks yet.

View summaryAll projectsHome